Mt Hawthorn (South Scarborough Beach Road)

Project number Project 340
Detailed design Late 2025 (to be confirmed)
Estimated construction start date Early 2027
Estimated duration Approximately 26 months

  Switchgear

Primary equipment site with a switchgear.

  Transformer

Primary equipment site with a transformer.

  Combination

Primary equipment site with a combination of equipment.

Overhead transmission lines

High voltage transmission power lines. These lines will not be undergrounded.

Project area boundary

Was this page helpful?